Recirculation and flushing
Free housing on gridded floor with underneath channels and washing recirculation.
Booster pump for the recirculation plant. Electropneumatic board for the programmed management of the washing operations, Line switch for the selection of the lanes to be recirculated.
Slurry flow's recirculation in the lanes under gridded floor and in the collecting head channel.
Flushing plants can be realized both with booster pump and with piezometric tower.
Washing of the feeding and rest lanes with POP/OFF valve for the slurry draining.
Programmed washing system for the waiting area (before milking) and for the movement corridors.