BIOMETHANE ROTA GUIDO: 250 NM3/H SYSTEM AT SAS BIO…
Biomethane Rota Guido at Sas Biogazmer in Mer (France), installation with 250 Nm3/h capacity dedicat…
The non-stop research, the continous up-to-date, and the absolute attention to the problems of the animals and of the environment, have lead to the development of many news that, going from the single equipment to the realization of complete plants, always sum up the will of the Rota Guido company to be close to the breeders and share the problems of the zootechnic sector.
Biomethane Rota Guido at Sas Biogazmer in Mer (France), installation with 250 Nm3/h capacity dedicat…
For Rota Guido, the modernization project of Côte d'Ivoire poultry sector continues: new inspection …
150 kW photovoltaic installation at the new Rota Guido establishment: it is forseen a 87.540Kg per y…
Rota Guido took part in the conference organised by Milk Center in Hungary: here is the speech by Al…
In the Bozzini's farm, where no detail seems to be left to chance, two beautiful stables for dairy c…
On Friday the 7th of June was presented the research Centre for Livestock and Environment (CREI - Ca…
500 kW Biogas plant implemented at Gaec Hulmer – Manche (France)
New cowshed for Tromba Andreana's Farm in Gavassa (RE). We are building the new barn for their 220 …